Jul 15, 2009 03:35 PM | 2
Surface coal mining—the controversial procedure that levels mountaintops and pollutes streams in the quest for the nation’s dirtiest fossil fuel—will face stricter rules under the Obama administration.
Since 1982, coal-mining operations in the U.S. have been able to dump rubble in pristine streams without undergoing the typical environmental review and public comment period required under the Clean Water Act. This morning, the Army Corps of Engineers announced plans to suspend this streamlined nationwide permit program, called NWP 21, which affects a large fraction of permits issued in Appalachia.
“By getting rid of nationwide permits, it will hopefully slow the process down and make it more open,” says Tierra Curry, a biologist at the Center for Biological Diversity in Portland, Ore. Although she is pleased with the regulations, she says they don’t go far enough. Earlier this spring, after the administration said it had plans to scrutinize individual permits more closely, it proceeded to approve 42 of 48 new mountaintop removal permits. “That’s the most permits than have been approved in years,” she observes.
Teri Blanton of Kentuckians for the Commonwealth also welcomed the proposal, but worried that it would grandfather in some 100 pending permits in Kentucky. “Thirteen miles of stream are slated to be buried on the north fork of the Kentucky river,” she says. “I really hope they do individual permits and take the cumulative impact into account.”
The Corps will issue a final decision in the fall, following a public comment period.
In related news, the Associated Press reports that mountaintop mining operation Massey Energy, has obtained a court order barring protesters from returning to the site. Last month NASA researcher James Hansen and other protesters were arrested at a Massey processing plant in West Virginia.
Image of West Virginia mining operation courtesy rachelmolenda via Flickr
More News Blog: Next: Lucy on Broadway: Discoverer says the famous hominid fossils belong in the limelight Previous: Smart spiders spy on Mount Saint Helens
Deadline: Jun 29 2013
Reward: $7,000 USD
The Seeker for this Challenge desires proposals for chemical methods that could rapidly degrade a dilute aqueous solution
Deadline: Jul 14 2013
Reward: $1,000,000 USD
This is a Reduction-to-Practice Challenge that requires written documentation and&
Powered By: 
2 Comments
Add CommentWhy don't the Army Corps just stop issuing MTR permits all together. You don't need to destroy the mountains and water ways to get coal. Deep minning can do just as much destruction as MTR, so why not stay with deep minning? MTR leaves the land uninhabitable and the water kills plant, animal, and human life forms. Unless the AC loves uninhabitable land and killing off life forms as much as the minning companys do, why not just stop issuing all MTR permits.
Reply | Report Abuse | Link to thisJames Davis:
Reply | Report Abuse | Link to thisWe do not need to mine coal at all. It has fantastic properties holding on to methane, mercury and other poisons which are released by mining and burning.
The coal age is over. Control population numbers, rebuild forests and increase biodiversity or become the perpetrators of the sixth extinction.