First light! Panels start producing power, but paperwork drags on
Editor's Note: Scientific American 's George Musser will be chronicling his experiences installing solar panels in Solar at Home (formerly 60-Second Solar). Read his introduction here and see all posts here.
What a beautiful Indian summer day to inaugurate our solar panels. The electrician finished wiring up the inverter on Saturday and flipped the switch, and I spent much of yesterday running to the basement and checking the inverter readout to confirm that the sun was indeed powering our house. The system isn’t hooked up to the grid yet, but at least we're offsetting some of our domestic power consumption.
I found that the array generated power almost all day, from 8 a.m. to 6 p.m. At first it was just a trickle, but it reached a maximum of 1,995 watts around noon (at our longitude, the sun reaches its highest elevation at about 12:40 p.m. Daylight Savings Time). In all, the array put out about 9.5 kilowatt-hours of energy yesterday.
What a relief. After the problems we’ve had with our contractor, I half-expected the system to fail in a blaze of sparks. In the event, it produced just what the PV Watts calculator predicted. The system is rated at 3 kilowatts of DC power, and at this time of year, the sun’s rays strike the panels at an angle of about 45 degrees, which cuts the output by about a third.
Much as I savored the moment, the process isn’t over yet. The following still needs to happen:
- The town building department needs to inspect the electrical and structural work.
- The utility needs to install a new electric meter.
- The state needs to inspect the system.
- The utility needs to visit to close the loan that constitutes the largest chunk of the subsidy. Several people commenting on my earlier blog posts said that solar paperwork isn’t as bad as I made it out to be, but I don’t think they were aware of the complications of this particular loan program. Despite the difficulty, I’m grateful to the utility for providing oversight of our installer.
The bottom line is that I don't think solar isn’t ready for prime time yet. If your state doesn’t have a company that offers leasing or power-purchase agreement, whereby they handle all the nitty-gritty for you, I’d hold off a couple of years until the government agencies, utilities, and installers work out the kinks.
1st Light Energy contractor installing the inverter in George's basement
You Might Also Like
Discuss This Article
Subscription Center
World Changing Ideas
-
Video ContestInnovation is the key to a better future. Enter your own World Changing Ideas videos in our contest.
Most Popular Blog Posts
9,000-year-old brew hitting the shelves this summer
Manipulative meow: Cats learn to vocalize a particular sound to train their human companions
Wylie Coywolf: The coyote-wolf hybrid has made its way to the Northeast
A lizard that swims through sand
Scientists urge EPA to assess potential phthalates risks
Editor's Pick
-
Time to Ban Production of Nuclear Weapons MaterialA new global treaty that cuts off production of plutonium and highly enriched uranium for nuclear weapons could jump-start nuclear disarmament and help prevent proliferation
Energy & Sustainability Newsletter
Get weekly coverage delivered to your inboxVideo
Podcasts
-
60-Second Science
RSS ·
iTunes
Botoxed Face Impairs Bad Feelings
click to enable
-
60-Second Science
RSS ·
iTunes
Distracted Customers' Wait Times Fly
click to enable
Slideshows
Genetically Modified Forest Planned for U.S. Southeast
Street Smarts: The BioBus Brings a Rolling Science Lab to Resource-Strapped Schools
Defusing the Methane Greenhouse Time Bomb
Is climate change hiding the decline of maple syrup?
Utility to Build First Power Plant with Greenhouse Gas Emissions Limits in California